83. Runoff from the right-of-way of a winter road disturbed during the construction of the road must be blocked and diverted towards vegetation areas located more than 20 m from an open peat bog with a pond, a marsh, a riparian swamp, a lake or a watercourse. The 20-m distance is measured from the limit that separates the stand from the open peat bog with the pond, the marsh, the riparian swamp, the lake or the permanent watercourse or from the upper limit of the bank of the intermittent watercourse. In the presence of a riparian ecotone, the measurement is made from the limit of the ecotone farthest from the environment to be protected.
473-2017O.C. 473-2017, s. 83.